The plan is available in Adobe PDF format by section below. Click filesizes to download.
The Management Plan sections (and supplements, where they exist) were formally adopted into the Fish and Wildlife Program.
PDF formats | ||
Screen | Section | |
11m | Entire plan except Appendices | |
60k | Executive Summary | |
4m | Introduction, Subbasin Overview, Aquatic Assessment, Subbasin Terrestrial Assessment, Integration of Aquatic and Terrestrial Components | |
6.2m | 3m | Inventory of Existing Programs and Projects |
430k | Management Plan, References | |
Appendices | ||
50k | A. Public Involvement Plan | |
640k | B. WDFW 2004, Asotin Subbasin Aquatic Assessment | |
40k | C. Out of Subbasin Survival Effects in EDT Analyses | |
60k | D. Nez Perce Tribe Species of Interest Listings | |
15m | E. SE Washington Wildlife Assessment | |
140k | F. Level 2 Diagnosis and Project Inventory | |
370k | G. Blue Mountain Elk Plan | |
20k | H. Land Acquisition | |
210k | I. Nez Perce Tribe Cultural Resource Study | |
60k | J. Objectives Analysis | |
1m | K. WDFW Asotin Subbasin Terrestrial Management Plan | |
400k | L. Terrestrial RM&E Plan | |
40k | M. Aquatic RM&E Plan | |
3m | Letters of Support | |
Last updated 9/14/04: Split Inventory and Mgmt Plan into 2 downloads |