Cover Letter from Shoshone Bannock Tribes
Memo providing a Preface, Introduction and Proposed Activities, and responses to the previous ISRP review
Attachment A: 2008 Implementation Plan
Attachment B: 2008 ISRP review (ISRP document 2008-11)
Attachment C: Yankee Fork Tributary Assessment, and Atlas (44mb PDF), Appendices (80mb PDF)
Attachment D: Preliminary Basis of Design Reports for Pond Series 2 (28mb PDF)
Attachment E: Preliminary Basis of Design Reports for Pond Series 3 (26mb PDF)
Attachment F: Level II Stream Inventory Survey was conducted by the USFS (27mb PDF)
Attachment G: Geochemical Characterization Draft Technical Memorandum
Attachment H: CH2M Hill geochemical characterization
Attachment I: Hydraulic and Habitat Suitability Analysis Draft Technical Memorandum, and:
- Maps 1-9 (27mb PDF)
- Maps 10-18 (25mb PDF)
- Exhibits 1-9 (32mb PDF)
- Exhibits 10-18 (41mb PDF)
Exhibit 1: Draft conceptual plans for the Pond Series 3
Exhibit 2: Draft conceptual plans for the Pond Series 2