Cover Letter from Shoshone Bannock Tribes

Memo providing a Preface, Introduction and Proposed Activities, and responses to the previous ISRP review

Attachment A: 2008 Implementation Plan

Attachment B:  2008 ISRP review (ISRP document 2008-11)

Attachment C:  Yankee Fork Tributary Assessment, and Atlas (44mb PDF)Appendices (80mb PDF)

Attachment D:  Preliminary Basis of Design Reports for Pond Series 2 (28mb PDF)

Attachment E:  Preliminary Basis of Design Reports for Pond Series 3 (26mb PDF)

Attachment F:  Level II Stream Inventory Survey was conducted by the USFS (27mb PDF)

Attachment G:  Geochemical Characterization Draft Technical Memorandum 

Attachment H:  CH2M Hill geochemical characterization

Attachment I:  Hydraulic and Habitat Suitability Analysis Draft Technical Memorandum, and:

Exhibit 1:  Draft conceptual plans for the Pond Series 3

Exhibit 2:  Draft conceptual plans for the Pond Series 2